|
Renovations
Renovating my latest house.
Introduction
Before
After
Comments
Introduction
I bought this house in May/June of 2001. I really liked the view, and the "bones" of the
house were solid. But the interior hadn't been updated in years. So over the course of
a year, I renovated pretty much every room.
Most of the big jobs (new cabinets, countertops, re-sheetrocking, etc.) was performed
by contractors. I did a lot of demolition and painting. I pretty much lost the entire
summer of 2001 (working during the days, at the house at night and weekends). But I
think it was worth it.
This page has the before + after tour. There are sub-pages with more step-by-step details
for those that are interested (see navigation panel at left).
Before
I put down an offer for the house in late May 2001. It took some time for the sale to
close, but finally in June all the papers were signed and I got the keys. So the first
thing I did was take my parents for a tour.
They were not impressed.
For one thing, the plumbing to the house was turned off. Apparently, the 2001 Seattle
earthquake had ruptured the water main to the house. But it was pretty much a given
that I'd have to replace most of the plumbing anyway.
The downstairs was particularly funky. The carpets had a strange wear pattern--I later found out
that the downstairs flooded during heavy rains.
After
Comments
Post a comment
WARNING: This is a very primitive comment posting. Stick to alphanumerics only! No quotes, brackets, etc.
|